Skip to Main Content

September Construction Update

Skip to Next Section

September Construction Update

Tony Clark

Director of Communications

September is almost coming to a close, and we have some exciting news on the construction progress of Steel Vengeance. 

First, you should know that we've been taking a TON of photos since construction started a year ago. You'll see those pop up very soon in a new construction gallery.

Let's bring you up to speed on where we are.

Rocky Mountain Construction is currently laying track, gingerly placing each steel rail into the intricate wood structure. 

They're also preparing the highest point of the ride by assembling bents and ledgers on the ground (these are the framed pieces that hold the track in place), and then lifting them up to be attached to the existing structure.

The trackwork is approximately 95% complete - there's just the initial drop and the top part of the lift to finish. The exciting news is that it the topping could happen very soon. 

After that, attention shifts to all sorts of other things - catwalks, railings and general "clean up" around the site. 

The mechanical components like the brakes, lift chain, sensors, etc. will all come right after we close. 

I'm hoping for an early Christmas present (the first ride), but just to set expectations: that's not likely!

So let's share some quick pics with you of things you haven't seen yet. And please, if you'd like to share, link directly to this blog entry. 

This is an inside-the-structure look at the overbanked turn just after the 4th inversion on the return back to the station, just before the last bunny hills.

Wow.

 

And if you look the other way, here's the exit out of the structure into the bunny hills:

 

 

This is the third inversion coming out of the section that goes inside the structure near the station:

 

 

Finally, a previously-unseen portion of the ride, the final brake run. If you remember, in the past, the brake run came down at an angle, and now, after the bunny hills, it goes up into this straight-ish section of track. 

The photo is taken from the station looking back, and if you look realllllly closely, you'll be able to see the train make its final "airtime run" as it approaches the brakes.

 

 

There's so much more to show you. Keep it here for more photos, updates and other fun surprises.

Share This

Tony Clark

Director of Communications

Post a Comment

Skip to Next Section

Before We Had Planet Coaster

Before there were video games and roller coaster simulators, we had to get creative, just like this guy.
Read More

HalloWedding at HalloWeekends

Looking for a fun way to get married this fall? We've got the ultimate opportunity for you!
Read More

Light Up the Point 2019

Find out about all there is to do during this year's Light Up the Point event, July 4 - 6.
Read More

Accurate Merchandise

We have new t-shirt designs in the park. Open up and take a look!
Read More

Not Into Big Thrill Rides? Cedar Point Has Plenty of Fun for Everyone!

Are rides not really your thing? Crystal shows you other amazing experiences at Cedar Point!
Read More

Tweetup Rules

These are the rules for our in-park Tweetups.
Read More

Tony's 2019 Season Tidbits

Tony shares a few tidbits for the upcoming season to make your visit more fun!
Read More

Let the 2019 Season Begin

Our General Manager, Jason McClure has a special message for you as we begin the 2019 season.
Read More

Finishing Touches

We take a look at last minute preparations as we get ready to open for the 2019 season.
Read More

The Last Piece of the Map

The very last piece of the Forbidden Frontier map is here!
Read More